Straus Square Pedestrian Plaza

City Installs Planters in New Straus Square Pedestrian Plaza

Posted August 28, 2017 at 5:05 am

The Straus Square Pedestrian Plaza finally gets a bit of definition. One month after the city closed off the eastern terminus of Canal Street and installed the sand surfacing, there is now green. Contractors were seen Friday morning unloading the planters (aka roadblocks) on either side of the plaza. Meaning, there will be no more […]

Filed Under

Streets

Citi Bike Dock Returns to Straus Square After Month-Long Hiatus

Last modified August 27, 2017 at 4:43 pm

Motor vehicle traffic through Straus Square may have terminated, but the bike share just resumed. In other words, the Citi Bike dock returned to the new pedestrian plaza yesterday after a month-long hiatus. The brief reprieve was timed to coincide with the recent resurfacing of the roadway between Rutgers Street and East Broadway. Crews installed […]

Filed Under

Streets

Straus Square Pedestrian Plaza Takes Shape with New ‘Skate Proof’ Street Surfacing

Last modified August 27, 2017 at 4:43 pm

Another baby step toward “calming” Straus Square. For the last several nights, a contractor crew has been preparing the tiny sliver of Canal Street between Rutgers and East Broadway for a new pedestrian plaza. Specifically, the granular rumble-strip coating and its adhesive were installed late last night, a surface meant to deter skateboarders from claiming the […]

Filed Under

Streets

Straus Square CitiBike Dock Temporarily Removed, as Pedestrian Plaza Nears Activation

Last modified August 27, 2017 at 4:43 pm

Yesterday morning, CitiBike dispatched a maintenance crew to Straus Square to extract its bicycle dock from the longtime perch. Flexible bollards that marked the hardware were likewise uprooted from the asphalt. CitiBike confirmed, however, that this removal is temporary, and at the “request of DOT.” All maps show this station – one that holds about […]

Filed Under

Streets

‘Mr. Robot’ Brought a Tower of Trash to Straus Square Last Night

Last modified August 27, 2017 at 4:44 pm

Did you see that massive pile of junk sitting in Straus Square? In case you were wondering, the tower of trash, so to speak, was actually set dressing for the Mr. Robot film shoot that happened around Seward Park yesterday. “No Parking” signs posted in the vicinity alerted residents to the show’s alias, “The Norwich […]

Filed Under

Streets

Straus Square will Permanently Close to Traffic this Summer

Last modified August 27, 2017 at 4:44 pm

Major changes are coming to Straus Square, the small Lower East Side traffic median. Namely, it’ll soon be absorbed by the larger Seward Park at its back, and lose that scruffy feel. As previously reported, Seward Park is the recipient of $6.4 million in funding as part of the Park’s Without Borders program. While much […]

Filed Under

Streets

The Lower East Side Partnership Wants to Create a ‘Pedestrian Plaza’ Alongside Straus Square

Last modified August 27, 2017 at 4:44 pm

Another land grab afoot? Straus Square, the concrete island memorial at the confluence of Canal, Rutgers, and East Broadway, is now in the crosshairs of the Lower East Side Partnership. It appears the business improvement district hopes to install another pedestrian plaza on the eastern terminus of Canal Street, near the entrance to Seward Park. […]

Filed Under

Streets